Answers are grounded in this paper and cite their sources.
In this paper, an advanced control strategy for grid-tied photovoltaic (PV) cascaded H-bridge (CHB) inverter is proposed. The circuit topology consists of a proper number of power cells (H-bridge configuration) connected in series and supplied by individual PV modules. The adopted control method is a mixed staircase-PWM technique performed by means of a sorting algorithm to determine cells' switching state. The cells' state is related to the need of charging or discharging a particular cell much more than the others by calculating the voltage error at each dc-link (e.g., by considering the difference between the maximum power point tracking (MPPT) reference and the measured quantity). A dedicated P&O MPPT permits to control independently the voltage of each dc-link; thus, increasing the power extraction even in mismatched conditions. In order to prove the effectiveness and feasibility of the proposed approach, a set of experiments are performed on a laboratory prototype of a single-phase five-level PV CHB. The control section is implemented on FPGA by using a dSPACE real-time hardware platform; thus, obtaining fully dedicated digital circuits. Experimental results show good performance in terms of MPPT efficiency, total harmonic distortion, and power factor in both normal operation and mismatch conditions.
No takes yet. Share an insight, caveat, or question.
Coppola et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: