Answers are grounded in this paper and cite their sources.
This paper presents a fuzzy-neural approach for constraint satisfaction of a generalized job shop scheduling problem (GJSSP) fuzzy processing times. Our study is an extension of recently developed research in a GJSSP where the processing time of operations was constant. Our paper assumes that the processing time of jobs is uncertain. The proposed fuzzy-neural approach can be adaptively adjusted with weights of connections based on sequence resource and uncertain processing time constraints of the GJSSP during its processing. The computational results show that the proposed neural approach is able to find good solutions in reasonable time.
No takes yet. Share an insight, caveat, or question.
Tavakkoli‐Moghaddam et al. (2007) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: