Many manufacturing processes involved in the fabrication and assembly of “high-tech” components have highly variable yields that complicate the planning and control of production. We develop a procedure to determine optimal input quantities at each stage of a serial production system in which process yields at each stage of production may be stochastic. The procedure is applied to an example in the manufacture of a light-emitting diode (LED) display using actual yield data. We also provide a brief analysis of the quantifiable savings obtained by reducing the variability of the yield at one production stage.
No takes yet. Share an insight, caveat, or question.
Lee et al. (1988) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: