Answers are grounded in this paper and cite their sources.
A simple, fast and effective heuristic for the Simple Assembly Line Balancing Type I problem (minimizing the number of workstations) is proposed. A fast and effective branch-and-bound algorithm, which incorporates this heuristic for use in bounding, is developed. The algorithm introduces heuristic fathoming as a technique for reducing the size of the branch-and-bound tree. Methods to solve the Simple Assembly Line Balancing Type II problem (maximizing the production rate) are also described. Upper bounds on all heuristics for both problems are provided.
No takes yet. Share an insight, caveat, or question.
Hackman et al. (1989) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: