Experimental evaluation demonstrates 61.92% scandium recovery from spent titanium chlorinator melt, highlighting an effective multi-stage hydrometallurgical recycling process.
Spent titanium chlorinator melt is a potential technogenic source of scandium, but its recovery is complicated by high contents of iron, aluminium and alkali and alkaline-earth chlorides. This study assessed a sequence of hydrochloric acid leaching, Fe(III) reduction with ascorbic acid, sorption on the strong-acid cation exchanger Lewatit MonoPlus SP112H, desorption with acidified ammonium sulfate solution, oxalate precipitation, calcination and an additional column purification. In a scaled-up test, leaching of 4 kg of the spent melt with 5% HCl produced 25.5 L of filtrate containing 475.30 mg Sc. Two-stage sorption recovered 90.9% of the scandium, and the overall desorption degree reached 94.8%. The kinetic data were better described by the non-linear pseudo-second-order model (R2 = 0.890–0.938). Precipitation and calcination gave 0.60 g of an intermediate oxide product with 65.0 wt% Sc, and the additional purification 0.45 g of a final oxide product in which X-ray diffraction identified cubic Sc2O3 as the predominant crystalline phase; the elemental analysis gave a purity close to 98 wt%. Recovery into the final oxide reached 61.92% of the scandium in the filtrate. Iron co-sorption and scandium losses during the additional purification remained the principal limitations of the process.
No takes yet. Share an insight, caveat, or question.
Ultarakova et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: