In this paper, we model the effects of imperfect production processes on the economic lot scheduling problem (ELSP). It is assumed that the production facility starts in the in-control state producing items of high or perfect quality. However the facility may deteriorate with time and shifts at a random time to an out of control state and begins to produce nonconforming items. A mathematical model is developed for ELSP taking into account the effect of imperfect quality and process restoration. Numerical examples are presented to illustrate important issues related to the developed model.
No takes yet. Share an insight, caveat, or question.
Ben‐Daya et al. (2000) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: