Answers are grounded in this paper and cite their sources.
The performance of the Shewhart X̄ control chart with estimated in-control parameters has been discussed a number of times in the literature. Previous studies showed that at least 400/(n – 1) phase I samples, where n > 1 is the sample size, are required so that the chart performs on average as if the in-control process parameter values were known. This recommendation was based on the in-control expected average run length (ARL) performance. The reliance on the expected ARL metric, however, averages across the practitioner-to-practitioner variability. This variability occurs due to the different historical data sets practitioners use, which results in varying parameter estimates, control limits, and in-control ARL values. In our article, we show that taking this type of variability into consideration leads to far larger amounts of phase I data than what was previously recommended. This is to ensure low levels of variation in the in-control ARL values among practitioners. The standard deviation of the ARL (SDARL) metric is used to evaluate performance for various amounts of phase I data. We show that no realistic phase I sample size is sufficient to have confidence that the attained in-control ARL is close to the desired value. We additionally investigate the effect of different process standard deviation estimators on the X̄-chart performance, showing that it is best to use a biased estimator. We also study the design of the X-chart for the case n = 1, drawing similar conclusions regarding the amount of phase I data. An alternative approach to designing control charts is recommended.
No takes yet. Share an insight, caveat, or question.
Saleh et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: