Answers are grounded in this paper and cite their sources.
This paper presents engineering and lightning performance data on the Tennessee Valley Authority's 161-kv and 115-kv transmission lines. Normal maximum line loadings are tabulated, and certain transmission line operating practices are described.
No takes yet. Share an insight, caveat, or question.
Hapgood et al. (1947) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: