Answers are grounded in this paper and cite their sources.
A single machine is available to process a collection of stochastic jobs. There may be technological constraints on the job set. The machine sometimes breaks down. Costs are incurred and rewards are earned during processing. We seek strategies for processing the jobs which maximize the total expected reward earned.
No takes yet. Share an insight, caveat, or question.
K. D. Glazebrook (1984) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: