Answers are grounded in this paper and cite their sources.
Due to the inherent volatility and unpredictability of current fuel prices and electricity demand, the formulation of long-term coal procurement plans for thermal power plants has become particularly difficult. To cope with the uncertainties brought by stochastic events in coal procurement process, a multi-stage robust programming method is proposed to achieve a trade-off between enterprise revenue and carbon emission. For dealing with the deep uncertainty caused by the lack of environmental information at early stages, the fuzzy set with randomly distributed boundaries is used to describe the early uncertainty. Subsequently, the model is transformed into two submodels representing ‘optimistic’ and ‘pessimistic’ positions respectively, which can reflect the decision-maker's preference for risks and expert opinion to uncertainty. The managers could control risks by adjusting confidence factor and the win–win situation between enterprise profitability and emission control is achieved through flexible allocation of resources. Case study demonstrates that the proposed method can achieve a 3.25% increase in expected profit comparing to deterministic programming. This method can help managers make a more reliable decision under premise of meeting carbon emission policies and power security in the current unknown and uncertain environments.
No takes yet. Share an insight, caveat, or question.
Jun et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: