Answers are grounded in this paper and cite their sources.
Microgrid (MG) is one of the important blocks in the future smart distribution systems. The scheduling pattern of MGs affects distribution system operation. Also, the optimal scheduling of MGs will result in reliable and economical operation of distribution system. In this paper, an operational planning model of a MG which considers multiple demand response programs is proposed. In the proposed approach, all types of loads can participate in demand response programs which will be considered in either energy or reserve scheduling. Also, the renewable distributed generation uncertainty is covered by reserve provided by both Distributed Generations (DGs) and responsive loads. The novelty of this paper is the demand side participation in energy and reserve scheduling, simultaneously. Furthermore, the energy and reserve scheduling is proposed for day-ahead and real-time. The proposed model was tested on a typical MG system and the results show that running demand response programs will reduce total operation cost of MG and cause more efficient use of resources.
No takes yet. Share an insight, caveat, or question.
Zakariazadeh et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: