The problem of preemptively scheduling a set of n independent jobs on an m processor open shop is discussed. An algorithm to construct preemptive schedules with minimum-maximum finishing time is presented. The worst case time complexity is 0(r + min {m4, n4, r2}), where r is the number of nonzero tasks. The maximum number of preemptions introduced is 0(min {rn, rm, n3, m3}). The algorithm is best possible for open shops with a fixed number of processors or jobs. In this case the maximum number of preemptions introduced is bounded by some fixed constant.
No takes yet. Share an insight, caveat, or question.
González (1979) studied this question.