Answers are grounded in this paper and cite their sources.
The Joint European Torus (JET) carried out the first preliminary experiment with a deuterium-tritium plasma in 1991. This utilised an on-site inventory of 0.25g. The future experimental programme for the JET machine includes two discrete phases using plasmas fuelled by deuterium and tritium. The first of these, in mid-1996, will generate around 2 × 1020 neutrons and require a site inventory of a few grams of tritium. The second is proposed to take place in 1999 if an extension to the JET project from 1996 is granted. This will require a few tens of grams of tritium and will generate up to 5 × 1021 neutrons. The JET Active Gas Handling System has been constructed to enable tritium to be recovered from the plasma exhaust and stored for re-injection. The design also minimises tritium discharges to the environment. It is currently being commissioned to meet the above programme and has been modified to take into account a new requirement for operation over extended periods during maintenance and D-D operation with tritium contaminated plasma exhaust. Commissioning of the Active Gas Handling System consists of inactive, trace tritium (∼40TBq) and full tritium (<3g) phases. The experience and main results of inactive commissioning are presented and the status of tritium commissioning is reviewed.
No takes yet. Share an insight, caveat, or question.
Bell et al. (1995) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: