The volt-second consumption in the PLT tokamak was measured. During the start-up phase, the volt-second consumption is determined primarily by the external and internal flux required to establish the current profile. The resistive volt-second loss on axis is typically < l/4 of the total volt-seconds consumed during the first 180 ms of the discharge. The measurements reported here provide an empirical basis for establishing the volt-second requirements for future tokamak devices.
No takes yet. Share an insight, caveat, or question.
Hawryluk et al. (1979) studied this question.