Considers flexible manufacturing systems using the "first come, first served" (FCFS or FIFO) scheduling policy at each machine. The authors describe and discuss in some detail simple deterministic examples which have adequate capacity but which, under FCFS, can exhibit instability; unboundedly growing WIP taking the form of a repeated pattern of behavior with the repetitions on an increasing scale.>
No takes yet. Share an insight, caveat, or question.
Thomas I. Seidman (1994) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: