Answers are grounded in this paper and cite their sources.
Modern owners of constructed facilities are increasingly investigating a variety of alternative procurement methods. These methods include design-build, turnkey, and construction management. To effectively service this market-driven expansion of project delivery strategies in the construction community, a fundamental understanding of owner attitudes is required. This paper discusses results of research conducted to address owners' attitudes toward one specific alternative contracting method, design-build. A tremendous growth in design-build and limited existence of documented research on owner's attitudes toward design-build necessitate a focus on this particular delivery strategy. Primary design-build selection factors identified and analyzed include establishing cost, reducing cost, establishing schedule, shortening duration, reducing claims, large project size/complexity, and constructability/innovation. Additionally, a comparison of private and public owner design-build attitudes is documented.
No takes yet. Share an insight, caveat, or question.
Songer et al. (1996) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: