EAST (HT-7U) is a large fusion experimental device. It is a full superconducting tokamak with 1 MA of plasma current, 1000 s of plasma duration, high elongation and triangularity. It mainly consists of superconducting magnets of poloidal and toroidal field (PF & TF), vacuum vessel (VV), thermal radiation shield (TRS) and cryostat vessel (CV). The significant difficulty for assembly of EAST is tight installation tolerances, which are in the order of several tenth of a millimeter. In particular, the alignment of plasma facing components to the magnetic axis of the device is less than ± 0.5 mm. At present, a reasonable assembly process of EAST has been defined, and based on it, the alignment method for EAST, including the survey control network, the location of the main components in different directions, the magnetic axis determination and the accurate positioning of the plasma facing components inside of the vacuum vessel and so on, has been defined by using the sophisticated optical metrology system (SOMS). This paper describes the assembly procedure of EAST and the installation tolerances associated with the main components. Meanwhile, how to establish the assembly survey control network, magnetic axis determination methods, are introduced in detail.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: