Answers are grounded in this paper and cite their sources.
Computational study reveals trade-offs between reliability and costs in power grids, highlighting optimal generator maintenance scheduling via goal programming.
The generator maintenance scheduling problem is a key decision-making task in power system planning, requiring schedules that ensure reliability while controlling operational costs. Motivated by reliability challenges and financial constraints in systems such as South Africa’s, this paper proposes a tri-objective optimisation framework that simultaneously minimises generator failure probability, production cost, and reserve margin. The model is formulated using goal programming to balance these competing objectives and is solved using simulated annealing and constraint programming. It is evaluated on the IEEE reliability test system and a large-scale Eskom-inspired system with 157 generating units. The results characterise trade-offs among reliability, cost, and reserve margin objectives, approximate a Pareto frontier, and demonstrate the effectiveness of the proposed framework as a decision-support tool for practical generator maintenance planning.
No takes yet. Share an insight, caveat, or question.
Dingle et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: