A wide variety of instrumentation was deployed during the construction of the sprayed-concrete lined tunnels at Heathrow Express Terminal 4 station. This paper presents data from the in-tunnel displacement monitoring system and for settlements above the tunnels, providing data on instrument survival and performance, and an overall summary of the displacements arising from tunnel excavation.
No takes yet. Share an insight, caveat, or question.
Clayton et al. (2006) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: