Answers are grounded in this paper and cite their sources.
This paper presents a method of locating a crane on a construction site using mathematical techniques. The optimum location and choice of the crane on a site is seen as one of the most important parts of construction planning. It proposes the algorithm which can define the least expensive cranage cost (the total cost of the hire, assembly and dismantling) by calculating the combined use of different cranes, such as truck crane, crawler crane, travelling based tower crane or fixed base tower crane. Conclusions are drawn as to the relevance of the application of the model to construction projects.
No takes yet. Share an insight, caveat, or question.
Furusaka et al. (1984) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: