An integrated cost/schedule performance curve provides a visual summation of costs, performance and time. Its graphical construction is reviewed together with illustrations from a particular project application. Data provided by such integrations can be used to detect trends and forecast future conditions.
No takes yet. Share an insight, caveat, or question.
Wayne M. Stevens (1986) studied this question.