Answers are grounded in this paper and cite their sources.
The paper considers the steady-state performance of existing schemes of polyphase distance protection for high-voltage systems and introduces new polyphase schemes for phase and earth-fault protection. Differences in the performance of various schemes are highlighted and a comparison is given for close-up faults and zone 1 boundary faults. A new approach is suggested to assess the high-speed tripping characteristic of a polyphase unit and a method is given to establish whether or not high-speed protection is possible during close-up faults. Results of computer studies indicate that prefault load and power swings have a less marked effect on the reach of the new scheme during resistive faults, than is the case with a conventional 6-element scheme. Comparisons are also made with five switched-distance schemes supplied by relay manufacturers in Western Europe and the advantages and disadvantages of the polyphase approach are listed
No takes yet. Share an insight, caveat, or question.
V. Cook (1981) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: