The scheduling of pumps for clean water distribution is a partially discrete non-linear problem with many variables. The scheduling method described in this paper typically produces costs within 1% of a linear program-based solution, and can incorporate realistic non-linear costs that may be hard to incorporate in linear programming formulations. These costs include pump switching and maximum demand charges. A simplified model is derived from a standard hydraulic simulator. An initial schedule is produced by a descent method. Two-stage simulated annealing then produces solutions in a few minutes. Iterative recalibration ensures that the solution agrees closely with the results from a full hydraulic simulation.
No takes yet. Share an insight, caveat, or question.
McCormick et al. (2004) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: