Answers are grounded in this paper and cite their sources.
Full voltage line to ground fault tests are performed on typical potential devices and the subsidence transient recorded. To show the worst case of residual voltage, faults are initiated while the primary voltage is passing through crest and zero.
No takes yet. Share an insight, caveat, or question.
A. Sweetana (1971) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: