Answers are grounded in this paper and cite their sources.
In this paper, an enhanced algorithm for hydro-thermal power system generation scheduling is presented. By applying the tabu search, a decomposition method and taking into account the nonlinearity of time-varying starting costs, an effective algorithm is proposed to increase the computing accuracy of the dynamic scheduling process. The proposed approach may start from any traditional scheduling method proposed earlier, and improve the sub-optimal solution by a neighborhood search method. In this regard, additional constraints can be added to the problem formulation which provides a fast scheduling or rescheduling solution to large scale hydro-thermal power systems. The results show that the proposed algorithm is both efficient and reliable.
No takes yet. Share an insight, caveat, or question.
Bai et al. (1996) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: