They need to be tested to ensure the reliable operation of power cables. While cable testing, pre-damaged cable insulation may break down, resulting in an arc, which enables the location and repair of the damaged cable section. For this purpose, various cable fault location methods have been established. After an arc occurs these methods are applied with an additional cable fault location equipment. This paper introduces a new approach, where cable testing and cable fault pre-location are combined to test the device’s feasibility a field study was conducted, which is presented in this paper.