Answers are grounded in this paper and cite their sources.
Currently, Japanese grid codes require photovoltaic (PV) power generation systems to continue supplying power to the grid as soon as possible even if the systems temporarily stop their operation. Although the fault ride-through (FRT) capability was originally proposed for preventing a cascading frequency drop in the power system, the capability has the impact on other instability phenomena such as transient stability. In this study, we focus on the post-fault active power recovery of the PV systems. The impact of the recovery speed on the transient stability is investigated under different load conditions, static/dynamic load condition. Numerical examples are carried out for the one-machine one-load infinite-bus system, and the effects of the recovery speed are evaluated by equal area criterion and critical clearing time. As a result, we have found both desirable and undesirable effects on the transient stability depending on the load condition.
No takes yet. Share an insight, caveat, or question.
Kawabe et al. (2016) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: