Answers are grounded in this paper and cite their sources.
, with over 99% precipitation efficiency. Overall, the proposed route integrates Pt recovery, fluorine capture, and carbon material collection into a streamlined process that can be completed within approximately 24 hours, offering a practical and scalable strategy for industrial MEA recycling.
No takes yet. Share an insight, caveat, or question.
Phuenhinlad et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: