A predispatch model that minimizes generation and transmission losses on hydroelectric power systems is presented and applied to the hydroelectric power system of COPEL, a Brazilian utility located in Southern Brazil. Power loss in the generation and transmission systems is minimized on an hourly basis throughout a day. Load demand as well as generation, transmission and interchange operational constraints are satisfied. Hydroelectric generation characteristics are described in detail. Power loss in hydroelectric generation is associated with a reduction in turbine-generator efficiency and effective water head. The latter is due to an increase in tailrace elevation and penstock head loss. Power loss upon transmission is calculated as a quadratic function of active power flow, as represented in a DC load flow model. The predispatch model was evaluated under typical operational conditions, achieving significant savings with respect to actual operation.
No takes yet. Share an insight, caveat, or question.
Soares et al. (1997) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: