Amongst the magnet development program of a large-apertureNb₃ Snsuperconducting quadrupole for the Large Hadron Collider luminosity upgrade, six quadrupole magnets were built and tested using a shell based key and bladder technology (TQS). The 1 m long 90 mm aperture magnets are part of the US LHC Accelerator Research Program (LARP) aimed at demonstratingNb₃ Sntechnology by the year 2009, of a 3.6 m long magnet capable of achieving 200 T/m. In support of the LARP program the TQS magnets were tested at three different laboratories, LBNL, FNAL and CERN and while at CERN a technology-transfer and a four days magnet disassembly and reassembly were included. This paper summarizes the fabrication, assembly, cool-down and test results of the six magnets and compares measurements with design expectations.
No takes yet. Share an insight, caveat, or question.
Caspi et al. (2009) studied this question.
Synapse has enriched 4 closely related papers on similar clinical questions. Consider them for comparative context: