This paper describes an extension of the Baleriaux methodology that represents chronological aspects of hydrothermal power system reservoir operation. The production costing problem is decomposed into a sequence of chronological hydro reliability problems. Those reliability problems are analytically solved by a sequence of convolutions of reservoir storage levels, demand, inflows and generation capacity. The methodology is illustrated in a case study with a utility-derived system, and the results are compared with existing solution schemes.
No takes yet. Share an insight, caveat, or question.
Maceira et al. (1996) studied this question.