Answers are grounded in this paper and cite their sources.
Methods are developed for approximating dynamic aspects of power system costs within the load duration and probabilistic framework. The approach uses a transition-frequency function, as applied in frequency and duration methods of system reliability assessment, together with a function expressing the RMS prediction error in load forecasting. The author shows how the transition-frequency function can be used to estimate plant startup and banking costs under various conditions. He demonstrates how the calculations can be performed in terms of cumulants of the functions involved, making possible a very efficient formulation.>
No takes yet. Share an insight, caveat, or question.
Michael Grubb (1989) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: