Answers are grounded in this paper and cite their sources.
An economic alternative to the c chart is described as a statistical model of upward shift from c0 to c1, and costs of the two charts are compared in theory. For a range of c chart costs the savings associated with economic design increase linearly.
No takes yet. Share an insight, caveat, or question.
Black et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: