Answers are grounded in this paper and cite their sources.
In this study we analyse the behaviour of production levels and stocks in an integrally controlled multi-product multi-phase production system, We show that certain types of variations in the master production schedule (MPS) may lead to large short-term variations in production. To reduce the costs of these variations we introduce production smoothing, and we derive a modification of well-known integral production decision rules to realize smoothed production behaviour. By means of a small scale example we demonstrate the quantitative effects of our production smoothing rule on the variations in stocks and production levels. Finally, we present the general structure of a cost model that can be used to determine appropriate values for the smoothing parameters, given a specific production structure, a given capacity structure, and a given variability of the MPS. We discuss various possibilities to arrive at these values.
No takes yet. Share an insight, caveat, or question.
Jwm Will Bertrand (1986) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: