Answers are grounded in this paper and cite their sources.
Effects of superheater tube deactivation and replacement to the energy dynamics and steam heating cost are important but less explored issues in boiler operation management. The energy and exergy efficiencies of a medium-pressure superheater with tube deactivation from a petrochemical plant are analyzed for sustainable energy management. Replacement of the original superheater with a new superheater allows a comparative steam heating cost analysis for operation under approximately similar settings. The exergy evaluation approach is useful for a practical energy management assessment of superheaters due to tube deactivation and the identification of operation errors. At the design steam rate of 80 tonne/hour, the original superheater suffers a 3% reduction in effectiveness for every tube deactivation while the energy and exergy efficiencies are reduced by 6.4% to 7.7% and 3.7% to 7%, respectively. The exergoeconomic analysis shows a 300% higher steam heating energy cost for the new superheater, indicating that the new superheater operation setting is non-optimal. The average total exergy of the auxiliary boiler after superheater replacement is also lower by 6.8% to 7.2% compared to the original superheater. The non-optimal setting also leads to lower exergies at the air preheater and higher required fuel rates at the auxiliary boiler.
No takes yet. Share an insight, caveat, or question.
Tijani et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: