Answers are grounded in this paper and cite their sources.
With the continuous development of building information modeling technology, this article explores an innovative BIM forward integration design scheme, aiming to deepen information collaboration and efficiency in the construction process of building engineering. By adopting BIM technology, information from various stages such as design, construction, and operation can be integrated, achieving collaboration between design and construction. During the design phase, emphasis is placed on close collaboration among multidisciplinary teams, as well as real-time information transmission between design decisions and construction preparation. The results showed that the reinforcement of steel plates ensured that the collapse of the box exceeded 2.5 meters, and the stable completion without side risks is crucial for the safety of bridge engineering. It is of great significance for the promotion of BIM forward integration design in building construction.
No takes yet. Share an insight, caveat, or question.
Xueyou Hu (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: