Laboratory experiment demonstrates enhanced consolidation and shear strength in dredged slurry via top-bottom vacuum preloading, suggesting superior soil stabilization at an optimal time ratio.

Key Points

  • To investigate the consolidation performance of a top-bottom drainage vacuum preloading method for dredged slurry and identify the optimal bottom-to-top vacuum application time ratio.
  • Conducted laboratory model tests comparing conventional vacuum preloading against top-bottom drainage vacuum preloading on dredged slurry.
  • Varied the bottom-to-top vacuum application time ratio to determine its effect on drainage, settlement, and strength uniformity.
  • Identified an optimal bottom-to-top vacuum application time ratio of 1:1.
  • Achieved a 14.4% increase in average vane shear strength and a 6.0% reduction in post-treatment water content at the 1:1 ratio compared with conventional vacuum preloading.
  • Demonstrated higher total drainage, larger soil settlement, and improved vacuum pressure uniformity across the dredged slurry profile.

Cite This Study

Fu et al. (2026) studied this question.

synapsesocial.com/papers/6a9bd4346b95aff0620ebac4https://doi.org/10.1680/jgein.25.00211
View Full Paper
Ask AI
Bookmark
Share

Also Consider

Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context:

  1. 1Full-scale field study on cyclic vacuum preloading for dredged slurry-reclaimed ground2025
  2. 2Expandable and straw-woven drains for dredged slurry with intermittent vacuum preloading2026
  3. 3A two‐stage combined filtration‐consolidation model for slurry ground treated by vacuum preloading2024 · 1 citations
  4. 4Reinforcement mechanism and effect of S-PVD vacuum preloading method for dredged sludge2025 · 2 citations
  5. 5Reinforcement treatment of dredging sludge using a novel method of electro-osmosis vacuum preloading2024 · 2 citations