Answers are grounded in this paper and cite their sources.
In this paper, we investigate an ordering-replacement modelling framework for a system deteriorating with two failure types: a repairable failure (Type-I failure) and an unrepairable failure (Type-II failure). Repairable failures are followed by minimal repair, whereas unrepairable failures are removed by a corrective replacement. A spare unit ordered regularly is associated with the system's operation time T and the number N of successive working times for preventive replacement, or ordered in emergency at any unrepairable failure for corrective replacement, whichever is first to happen. Three kinds of objectives – system availability, expected cost rate, and cost-effectiveness – are optimised to seek for the optimal spare unit ordering schedule (T*, N*), respectively. The existence and uniqueness of each optimal ordering policy are derived analytically and computed numerically.
No takes yet. Share an insight, caveat, or question.
Chang et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: