Answers are grounded in this paper and cite their sources.
Simulation study reveals that targeted speed reductions shift operational burdens across inland vessel corridors, highlighting the need for route-integrity constraints.
Inland-vessel speed reductions targeted at priority segments can reallocate a normalized burden proxy across a fixed corridor. We develop a route-integrity speed-planning model that accepts a plan only when it attains the priority target, preserves route-wide improvement, and caps the largest non-priority-segment increase. The kinematics distinguish speed over ground, along-route current, and speed through water; without voyage-matched current or speed-through-water observations, the cases use zero-current analytical references. We evaluate two AIS-derived cases: the 27-point Case A as a sparse stress test and Case B as the primary spatial case after WGS84 and ESA WorldCover alignment checks. Under the equal-time constraint, an unprotected 2% target induces local deterioration. With a 0.5% non-priority cap, Case B supports a certified maximum target of 0.999%; a 2% late-arrival allowance raises the certified maximum target to 11.912%. Direct search over 0.1-kn commands finds a feasible plan for Case B; however, none of 1000 sampled ±0.2-kn execution-error profiles remains feasible. The framework identifies model-internal proxy transfer rather than measured energy, emissions, or exposure effects.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: