Answers are grounded in this paper and cite their sources.
In this paper design of electro-hydraulic motion control systems for offshore knuckle boom cranes is discussed.The influence of the control valve bandwidth along with the ramp time for the control signal are investigated both analytically with simplified system models and numerically with an experimentally verified crane model.The results of both types of investigations are related to general design rules for selection of control valves and ramp times and the relevance of these design rules is discussed.Generally, they are useful but may be too conservative for offshore knuckle boom cranes.However, as demonstrated in the paper, the only proper way to determine this is to evaluate the motion control system design by means of simulation.
No takes yet. Share an insight, caveat, or question.
Bak et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: