Answers are grounded in this paper and cite their sources.
The new D2 recombination superconducting dipole is a key two-in-one Nb-Ti magnet with a 105 mm bore aperture for the high luminosity LHC accelerator upgrade project (HL-LHC) at CERN expected in operation from 2024. A short model MBRDS1 magnet of 1.6 m magnetic length has been designed by INFN (Genova), built by ASG Superconductors, and cold tested at CERN within a INFN - CERN collaboration framework. This model magnet features novel magnetic and mechanical design elements, which include the cancellation of unwanted cross-talk field multipoles through asymmetric coils, aluminium alloy collar pack preloading rings and a dedicated axial structure design. The future series of four 8.5 m long full-length dipole magnets shall be installed on both sides of the ATLAS and CMS interaction points with an integral field of 35 T.m and 4.5 T bore magnetic field. This paper presents the first power test results including training, protection, and field quality. Short model results will give a relevant feedback for the prototype construction and the series production.
No takes yet. Share an insight, caveat, or question.
Foussat et al. (2020) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: