Answers are grounded in this paper and cite their sources.
This study presents a new pressure swing adsorption (PSA) configuration using two columns integrated with a tail gas balloon that enables simultaneous production of two high purity products. Two of the four cycle developed were able produce two products, i.e. bio-methane with purity > 97.0 and biogenic CO 2 with purity > 99.5 mol%, simultaneously. The energy efficiency of the best cycle is found to be 823 kJ/kg biomethane which is slightly better than other reported PSA systems. Most importantly, the system productivity (7.975 mol.kg −1 .h −1 ) is much higher than other PSA configurations that have low methane slip in the CO 2 -rich stream. A cost estimation (CAPEX and OPEX) determined CAPEX of 1.66 million USD for a PSA system processing 500 Nm 3 /h of biogas . Use of polymeric balloons contribute in cost reductions by 8.3 %. The production cost of bio-methane is estimated to be 0.595 USD/Nm 3 with further available reduction upon valorization of biogenic CO 2 . This study demonstrates that a system analysis can significantly contribute in improving the overall separation performance of biogas upgrading. The economic analysis helped us in determining that the compressor constitutes 60 % of the CAPEX and cost reductions in this area are very important to improve upgrading plants.
No takes yet. Share an insight, caveat, or question.
Canevesi et al. (2024) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: