Answers are grounded in this paper and cite their sources.
We consider a manufacturing system in which an upstream machine (UM) transfers a raw material to a downstream machine. The UM deteriorates stochastically with usage and may fail. The deteriorating process is described by a non-stationary gamma process. Preventive maintenance action is performed on the UM at its working age T. The preventive maintenance cannot restore the machine to as good as new state. The machine tends to deteriorate faster with the increasing number of maintenance. A buffer has been built between the two machines in order to cope with unexpected failure and planned preventive maintenance. The buffer size K and the working age T at which the preventive maintenance is initiated are the two decision variables of the model. Under the bivariate policy (K, T) we derive the average cost rate C(K, T). The optimal policy (K*, T*) such that C(K, T) is minimised can be obtained numerically by trading off the operational cost, the preventive maintenance cost, the replacement cost, the inventory holding cost and the shortage cost. We study, by means of numerical results, the influence of the variation of some parameters on the optimal policy.
No takes yet. Share an insight, caveat, or question.
Cheng et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: