Answers are grounded in this paper and cite their sources.
Control charts for the process average play an important role in process control. In the presence of prior information, using Bayesian approach, one can construct posterior control chart for process average ( X ̅ posterior control chart). The control limits of the proposed chart are derived under the assumption that the process average has a conjugate prior distribution. Both cases – variance is known and variance is unknown – are discussed. When the variance is unknown, the control limits are constructed using Unbiased Estimator (UE) and Maximum Likelihood Estimator (MLE) of the variance. The power and Average Run Length (ARL) of the proposed chart are obtained. The newly constructed X ̅ posterior control chart is compared with a few other X ̅ charts described in the literature.
No takes yet. Share an insight, caveat, or question.
Bhat et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: