In this paper, a problem of scheduling jobs with different sizes and fuzzy processing times (FPT) on non-identical parallel batch machines to minimize makespan is investigated. Moreover, the processing time (PT) of each batch is subject to the location-based learning and total-PT-based deterioration effect. Since this is an NP-hard combinatorial optimization problem, an improved intelligent algorithm based on fruit fly optimization algorithm (IFOA) is proposed. To verify the performance of the algorithm, the IFOA is compared with three state-of-the-art algorithms. The comparative results demonstrate that the proposed IFOA outperforms the other compared algorithms.
No takes yet. Share an insight, caveat, or question.
Wang et al. (2021) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: