Answers are grounded in this paper and cite their sources.
Recorded lag times of snowmelt events in a small catchment The hydrological and meteorological data collected in small, lowland catchment during snowmelt floods have been used to calculate lag time of runoff (Lag) and lag time of sediment yield (Lags). Both, Lag and Lags are important characteristics of the instantaneous unit hydrograph (IUH) and instantaneous unit sedimentgraph (IUSG). Field data from Zagożdżonka River catchment have been used to demonstrate the relationship between lag times. The results of investigation show that: a) there is a strong relationship between Lag and Lags; b) in most cases the value of a = Lags/Lag is smaller than 1; c) in case of snowmelt floods there was only poor correlation between parameter a and the total runoff depth (water supply).
No takes yet. Share an insight, caveat, or question.
Hejduk et al. (2011) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: