Experimental and numerical study demonstrates structural feasibility of prefabricated pavement slabs in gas drilling sites, indicating potential to reduce construction waste and assembly times.
In recent years, traditional cast-in-place concrete construction for pre-drilling engineering in unconventional natural gas fields has generated large amounts of waste concrete, consumed significant resources, and prolonged project schedules. To address these issues, this study proposes a prefabricated pavement slab system as a green and low-carbon alternative. Based on vehicle load surveys at shale-gas well sites in southwestern China, three loading conditions (design, overload, and ultimate axle loads) were defined. Theoretical calculations were then performed for reinforcement design, crack-width control, and local bearing capacity verification. A full-scale precast slab (3000 × 1495 × 150 mm) was fabricated and tested under static monotonic loading to measure deflection, crack development, steel strain, and concrete strain until failure. Separately, a three-dimensional finite element model of a four-panel pavement system (including a mortar-leveling layer and soil subgrade) was developed in ANSYS to simulate static and, preliminarily, moving loads. The experimental slab reached an ultimate load of about 365 kN (based on a single specimen, and thus not statistically representative), with ductile bending failure and crack/deflection patterns typical of reinforced concrete. The numerical model reproduced the cracking load and peak capacity with deviations below 17% from the test data, though post-cracking deflections were underestimated. Overall, the results demonstrate that the proposed prefabricated system is structurally feasible for heavy-duty drilling sites. It enables factory production, rapid on-site assembly, and reuse after dismantling, thereby reducing construction waste, shortening timelines, and supporting energy conservation and emission-reduction goals in the context of China’s green building policies.
No takes yet. Share an insight, caveat, or question.
Tan et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: