Regulatory-strategy analysis demonstrates sub-100 MW fusion reactor compliance with byproduct-material licensing, highlighting reduced off-site radiation hazard boundaries.
The regulatory pathway is as decisive for a fusion plant as its physics, and it is not chosen by assertion: it is fixed by the statutory definition of the facility and, for the graded case, by a quantitative dose bound. We give a first-principles regulatory-strategy analysis for the Hyperion compact spherical-tokamak (ST) breeder (design point Q=3.076, P_ fus=85.04, thermal power P_ th=95.2, I_p=9.66, B_0=8, negative triangularity δ=-0.30, elongation κ=2.0, major radius R_0=1.20, aspect ratio A=2.5, centrepost peak field 16.84). Following the 2023 U.S. Nuclear Regulatory Commission (NRC) determination and the ADVANCE Act (2024), fusion energy systems are regulated as byproduct material under 10 CFR Part 30, not as production or utilization facilities under Part 50/52. We show this is not merely permitted but quantitatively correct for a sub-100 machine. We formalise the licensing decision as (i) a statutory predicate under Atomic Energy Act 11 — fusion possesses no special nuclear material and no self-sustaining fission chain reaction, so it cannot be a utilization facility — and (ii) a dose predicate for the graded path: the maximum hypothetical accident (MHA) committed effective dose at the exclusion-area boundary must fall below the 1rem early-phase protective-action guide. We derive the full source-term-to-dose chain in closed form — mobilizable tritium inventory, HTO chemical-form weighting, Gaussian-plume dispersion , and inhalation dosimetry — and evaluate it on the frozen design. The standing in-process tritium inventory is ~SI675 (~SI6.5MCi), held there by direct internal recycling and a permeation-reduction factor 2000; with the design-basis released inventory confined to the gram scale, the 1rem contour of the MHA sits at 239 (class F, 2), a modest exclusion area rather than a kilometre-scale emergency-planning zone. There is no fission-product source term, no criticality, and no decay-heat melt drive: post-shutdown decay heat is 0.95 at 1 falling to 95 at one day, passively bounded below 710. Neutron-activated structure classifies entirely at or below 10 CFR 61.55 Class C with no greater-than-Class-C waste. All quantities are frozen anchors in the Kronos de-risking register, reproduced on a GPU-accelerated OpenMC/depletion campaign. This is a regulatory-strategy analysis, not legal advice or a filed application; site-specific determinations remain for counsel and pre-application engagement. Key results (frozen anchors): a_T = 3.57 ×10^14\; chiq = 3.4 ×10^-4\; B = 3.3 ×10^-4\; HTO = 1.8 ×10^-11; S_n = 3.009 ×10^19\; N = 1.2 ×10^8. Methods & codes: OpenMC, DAGMC, ENDF/B-VIII.0. Live verification: 11 gate validator(s) with live-recompute cards (11 reproduced). See the Verification section and data/verification.csv. Related: Paper page · De-risking register · 3D model · Learn more about Kronos Part of the 2026 Kronos publication series; independently re-run and stamped in the Kronos de-risking register (DOI 10.5281/zenodo.22645689). All numerical values are frozen design-point anchors; see the register. Public research artifact. No proprietary, financial, or supply-chain information is included. Note (REPLACE): This record supersedes a prior published version. The exact superseded DOI is pending founder confirmation (see SUPERSESSION_REVIEW.csv); an isNewVersionOf relation will be added before upload. Not yet asserted.
No takes yet. Share an insight, caveat, or question.
Ford et al. (2026) studied this question.