Answers are grounded in this paper and cite their sources.
This paper studies the optimal production run time in an economic manufacturing quantity (EMQ) model with imperfect rework and Poisson machine breakdowns under abort/resume (A/R) control policy. In most realistic manufacturing processes, generation of defective items and random machine breakdowns are inevitable. In this study, a random defective rate is assumed and all defective items produced are reworked when regular production ends. The rework process is assumed to be imperfect. A proportion of reworked items fail during the reworking and become scrap. The system is subject to random breakdowns. The A/R inventory control policy is adopted when breakdowns occur, under such a policy, and the production of the interrupted lot will be immediately resumed when the machine is fixed and restored. Mathematical modelling is used and the integrated long-run average production-inventory cost per unit time is derived. Theorems on conditional convexity and on bounds of optimal production run times are proposed and proved. A recursive searching algorithm is developed for locating the optimal run time within the bounds, which minimizes the expected production-inventory costs. A numerical example with sensitivity analysis is provided to give insight into the operational planning and control of such a realistic production system.
No takes yet. Share an insight, caveat, or question.
Chiu et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: