Why the study?
Modern fluoroscopy systems and diverse regulatory requirements have made acceptance testing complex, subjective, and time-consuming.
Design
Task group report
Answers are grounded in this paper and cite their sources.
Adoption of TG-272 acceptance tests is now required for fluoroscopy systems; extends prior standards to modern interventional and mobile C-arm units.
Modern fluoroscopes used for image guidance have become quite complex. Adding to this complexity are the many regulatory and accreditation requirements that must be fulfilled during acceptance testing of a new unit. Further, some of these acceptance tests have pass/fail criteria, whereas others do not, making acceptance testing a subjective and time-consuming task. The AAPM Task Group 272 Report spells out the details of tests that are required and gives visibility to some of the tests that while not yet required are recommended as good practice. The organization of the report begins with the most complicated fluoroscopes used in interventional radiology or cardiology and continues with general fluoroscopy and mobile C-arms. Finally, the appendices of the report provide useful information, an example report form and topics that needed their own section due to the level of detail.
No takes yet. Share an insight, caveat, or question.
Lin et al. (2022) studied this question. The AAPM Task Group 272 Report details required and recommended acceptance tests for fluoroscopy imaging systems, ranging from complex interventional units to mobile C-arms.
Synapse has enriched 10 related papers. Consider them for comparative context: